BUILDING UP THE SCRAMBLER
Updated 19.02.00
Scrambler load
This is where the build up begins. There is just
a heap of parts on the truck
Centre
First thing to do is to lift the centre down and adjust it
as level as possible. This is done by placing solid timber under the legs.
Sweeps
The radial arms are mounted to the centre.
The sweeps are mounted
Note the lights, that are already in place
Centre lights
The centre lights are lifted down in one bundle
and are opened.
Drive shaft
Drive shaft is being installed.
Engine
The engine is lifted down and installed at the end of the shaft.
Supports for the cars
Supports for the cars are set up.
The frame is ready
Cars are lifted down
Car closed
Car is already attached to the ride, but it's not opened yet.
Car opened
The car is now opened. The Scrambler is now fully operational.
Only fences need to be erected around the ride.
Scrambler waiting for customers